Coventry Scaffolding provided an independent access scaffold to allow for the replacement of cladding panels on the front façade of this residential block in Sutton, South London.

Aspects House scaffolding, Sutton

Full tower renovation
Independent access scaffold to all four elevations of this 60m high residential tower block in South London, including extensive bridging at the rear and gantries at the front and sides. The scaffold will allow cladding team to replace the defective panels on the façade.

Following a tricky start to this contract, the end is now in sight as we complete the final elevation of this huge tower block in South London. Generally the erection of the scaffold has gone without a hitch and on programme.

A huge success
The on-site team have been nothing short of fantastic, receiving six 100% safety scores from external auditors.

Brymor’s Site Manager commented: “Well done to all the team who have once again managed to get 100% on the latest H&S report, please thank everyone on site from me for their hard work and continues work towards H&S.” Needless to say, we also send our congratulations to our site team of Supervisors and Scaffolders.

Contracts Manager, Tim Higginson, said: “[An] excellent report and very positive, demonstrating a combined team effort and an acute sense of doing things safely. All at Brymor Group Southern have been watching the full marks rolling in and it has lifted the performance of other teams who have achieved it on some of their own inspections now. Aspects continues to be the team to watch. Well done!”