Projects › Westminster Hall

In June 2003, Coventry Scaffolding was proud to play a part in restoring the historic interior of Westminster Hall, the oldest surviving part of the Palace of Westminster.

Westminster Hall scaffolding

Conservation of a historic interior

This project to provide access for restoration and maintenance work at Westminster Hall posed unique challenges for the Coventry Scaffolding team. With its 11th-century hammerbeam roof and vast open space, designing and constructing the scaffolding required exceptional planning, specialist expertise, and the highest levels of care. Due to the hall’s Grade-I-listed status, no permanent fixings were allowed to the historic masonry or timber. Therefore, every element of the scaffold was freestanding, precisely calculated, and engineered to distribute loads without stress to the historic interiors.

A medieval marvel

Built in 1097, Westminster Hall is the oldest surviving part of the Palace of Westminster. Originally built to impress and serve as a royal residence and ceremonial space, the hall was the largest of its kind in England at the time and it quickly became a focal point of royal and legal authority.

Throughout its long history, Westminster Hall has served various functions. It was the home of England’s highest courts for centuries and hosted numerous significant events, including coronation banquets, state trials, and addresses by foreign dignitaries. Historic trials held here include those of Sir Thomas More, Guy Fawkes, and King Charles I. More recently, it has been used for lying-in-state ceremonies and major public occasions.

Freestanding birdcage scaffold

A complex birdcage scaffold was designed to span the hall, providing stable working platforms at multiple levels. The system included bespoke bridging sections to avoid contact with delicate architectural features, while still offering full access to the timber roof trusses, stone walls, and other interior elements under conservation. The Coventry team used lightweight aluminium components to minimise the loads and incorporated protective coverings and non-invasive anchoring solutions throughout. All work was carried out under strict heritage guidelines, in coordination with conservation experts, architects, and government bodies.

Westminster Hall Scaffolding Renovation
Coventry Scaffolding